Documents Available Upon Request
If you wish to obtain a copy of any of the reports that are listed below, please send an e mail to infc.npsl-nbsl.infc@canada.ca. The report will be e-mailed to you or instructions will be provided on how to retrieve an electronic version of the document within a week.
As these documents were developed for internal purposes, they do not all currently exist in both official languages. A translation of unilingual documents can be provided upon request. The timeframe to receive a translation will vary dependent on the size and technical complexity of the document.
Some sections of the reports have been redacted as they contain information that is notably personal, commercially sensitive or related to security.
Title of Report | Language of the Report |
---|---|
Integrating Design Considerations into the Contracting Process |
French |
Comparison of Observed Counts vs. Radar Counts |
French |
Champlain Bridge Count, Monthly (since March 2014) |
French |
Architectural Quality Report |
English |
Memorandum on Winter Suitability |
English |
Urban and Environmental Integration |
Both English and French available |
Preliminary Engineering and Coordination Services: Justification major bridge shoulder widths |
English |
Follow up report on the feasibility of recessed positioning of the luminaires on the NBSL towers to minimize visual impact of the luminaries. |
English |
Final Report P7006 - Preliminary Design Study for Intelligent Transportation and Tolling Systems |
English |
Geotechnical - Additional Investigations Report |
Both English and French available |
Count Station on Champlain Bridge |
English |
Preliminary Engineering and Co-ordination Services: Durability Report |
English |
Preliminary Engineering and Coordination Services: Temporary traffic management scenarios that require in-depth analysis (Lot 1 Task A4.4) |
English |
Preliminary Engineering and Coordination Services: Memorandum on Multiple-Use Path Configuration |
English |
Preliminary Engineering and Co-ordination Services: Major Bridges Final Report (Lot 3 Task A3.5) |
English |
Preliminary Engineering and Co-ordination Services: Highway Final Report (Lot 2 Task A2.5) |
English |
Preliminary Engineering and Coordination Services: Highway drainage report (Lot 2 Task A2.5) |
English |
Preliminary Engineering and Coordination Services: NBSL Corridor Project Constructability Report |
English |
Preparatory Study for Intelligent Transportation and Tolling Systems |
English |
Preparatory Study for Electrical and Lighting |
English |
Preliminary Engineering and Coordination Services: Preliminary Design and Cost Estimate Report - Major Bridges |
English |
Preliminary Engineering and Coordination Services: Preliminary highway design options and cost evaluation report (Task L2-A2.4) |
English |
Preliminary Engineering and Coordination Services: Interim Cost Review Report No. 2 |
English |
Preliminary Engineering and Coordination Services: Utilities in the NBSL Corridor |
English |
Final Report P7006 - Preliminary Design Study for Electrical and Lighting |
English |
Preliminary Engineering and Coordination Services: Design Progress Report |
English |
Preliminary Engineering and Coordination Services: Hydraulic Study |
English |
Ice Regime and Ice Loads on the Piers of the New Bridge |
English |
Results of Tests on the Concrete Barriers of the Champlain Bridge (2 reports) |
English |
Preliminary Engineering and Coordination Services: Highway Derogation Report (Lot 2 Task A2.5) |
English |
Preliminary Engineering and Coordination Services: Drainage of Major Bridges |
English |
Preliminary Engineering and Coordination Services: Inspection and Maintenance Report |
English |
Preliminary Engineering and Coordination Services: Pre-Project Implementation Plan Lot 1 Task A5.2 |
English |
Report on Investigations, Geotechnical Studies and Environmental Characterizations Volume 1 - Investigation Report (Information Report) |
English |
Report on Investigations, Geotechnical Studies and Environmental Characterizations Volume 2 - Borehole Log Reports, Laboratory Tests, Structural Descriptions and Rock Photographies |
English |
Report on Investigations, Geotechnical Studies and Environmental Characterizations Volume 3 - Borehole Log Reports, Laboratory Tests, Structural Descriptions and Rock Photographies |
English |
Title of Report | Language of the Report |
---|---|
New Bridge for St. Lawrence (Champlain): Public-Private Partnerships: A Best Practice Review across the Americas Issue 1 |
English |
Business Case for New Bridge for the St. Lawrence Corridor (Champlain: Preliminary Design and Costing Report (5% Development) |
English |
Cost Estimation for Intelligent Transportation and Tolling Systems, Electrical and Lighting Reference Design |
English |
Preliminary Design & Cost Gap Analysis |
English |
Business Case for New Bridge for the St. Lawrence Corridor (Champlain) - Traffic Micro Simulation Model |
English |
Component 2 : Traffic and Revenue Forecasts |
English |
Component 2: Future Year Model Development (Activity 15) |
English |
Component 2: Data Collection and Methodology Report |
English |
Component 2: Base Year Model Development |
English |
Component 2: Traffic and Revenue Forecasts |
English |
Review of financing issues |
English |
New Bridge for the St. Lawrence project in Montreal (evaluation of structures) |
English |
Tolling Options for funding the federally owned Montreal Bridges: Preliminary Study |
English |
Analysis of tolling the Champlain and Jacques Cartier Bridges |
English |
Analysis of tolling the Jacques Cartier and Honore Mercier Bridges |
English |
Jacques Cartier & Honore-Mercier Preparatory Study for Tolling |
English |
Activity 4 Assessment of tolls and P3 options for other JCCBI structures in Montreal |
English |
New Bridge for the St. Lawrence Business Case |
English |
Title of Report | Language of the Report |
---|---|
Cliff Swallow Management Plan for the New Bridge for the St. Lawrence Corridor |
Both English and French available |
Peregrine Falcon Management Plan for the New Bridge for the St. Lawrence Corridor |
Both English and French available |
Management Plan for the Northern Brownsnake in the Context of the Construction of a New Bridge for the St. Lawrence |
Both English and French available |
Follow-up report on the Northern Brownsnake in the Context of the Construction of a New Bridge for the St. Lawrence – Technical Report |
French |
Response Report on the Northern Brownsnake in the Context of the Construction of a New Bridge for the St. Lawrence |
French |
Site Research and Inventory for the Relocation of Rough Bugleweed in the New Bridge for the St. Lawrence Construction Area |
French |
Air Quality Assessment in the New Bridge for the St. Lawrence Corridor |
Both English and French available |
Air Quality Assessment in the New Bridge for the St. Lawrence Corridor |
Both English and French available |
Archeological Inventory (2014) New Bridge for the St. Lawrence Brossard Shore |
French |
Evaluation of Avian Habitat Loss Compensation Projects |
French |
Compensation Projects for Loss of Wetlands and Fish Habitat |
French |
Surface Water Sampling Program Final Report |
English |
Characterization Of Materials Likely To Contain Asbestos And Of Hazardous Materials/ 260 & 264 May Street, Montreal, Quebec |
Both English and French available |
Characterization Of Materials Likely To Contain Asbestos And Of Hazardous Materials 282 May Street, Montreal, Quebec |
Both English and French available |
Characterization Of Materials Likely To Contain Asbestos And Of Hazardous Materials 312 May Street, Montreal, Quebec |
Both English and French available |
Characterization Of Materials Likely To Contain Asbestos And Of Hazardous Materials 314 May Street, Montreal, Quebec |
Both English and French available |
Characterization Of Materials Likely To Contain Asbestos And Of Hazardous Materials 318 May Street, Montreal, Quebec |
Both English and French available |
Characterization of materials likely to contain asbestos and of hazardous materials 274 May street, Montreal, Quebec |
English |
Characterization of materials likely to contain asbestos and of hazardous materials 268 May street, Montreal, Quebec |
English |
Characterization of materials likely to contain asbestos and of hazardous materials 270 May street, Montreal, Quebec |
English |
Characterization of materials likely to contain asbestos and of hazardous materials 262 May street, Montreal, Quebec |
English |
Characterization of materials likely to contain asbestos and of hazardous materials 276 May street, Montreal, Quebec |
English |
Characterization of materials likely to contain asbestos and of hazardous materials 320 May street, Montreal, Quebec |
English |
Characterization of materials likely to contain asbestos and of hazardous materials 3031 Rushbrooke street, Montreal, Quebec |
English |
Characterization of materials likely to contain asbestos and of hazardous materials 3000 LaSalle boulevard, Montreal, Quebec |
English |
Wind Monitoring at the Champlain Bridge, Montreal (3 reports) |
English |
Archeological Potential Study |
French |
Air Quality and Greenhouse Gas in the New Bridge for the St. Lawrence Project Study Area in 2012 |
French |
Asbestos in the New Bridge for the St. Lawrence (NBSL) corridor |
Both English and French available |
Wind monitoring station installation and interim report |
English |
Assessment of Asbestos Presence in Soil NBSL Corridor and Adjacent Lots Greater Montreal, QC |
Both English and French available |
Greenhouse Gas Emissions Inventory Operational Phases Champlain Bridge and New Bridge for the St. Lawrence |
French |
In-water works restriction |
English |
Preliminary Engineering and Coordination Services: Review of Environmental Reports and Studies and Relevant Best Practice Guidelines (Lot 1 Task A5.1) |
English |
Preliminary Engineering and Coordination Services: Assessment of implications of using Envision on the NBSL Project |
English |
Qualitative risk assessment for the management of contaminated soils during construction of NBSL - Problem Formulation |
Both English and French available |
Qualitative risk assessment for the management of contaminated soils during construction of NBSL Management Plan |
English |
Stray and Induced Currents - Impact and Mitigation |
English |
Environmental property characterization – Phase II Lots 1 573 789 PTI and 4 122 344 PTIE - Montreal (Sud-Ouest Borough), Qc |
French |
Phase I and II Environmental Site Assessment Seven Lots ( 4 537 479, 4 537 494, 4 537 504, 4 537 487, 5 701 949, 4 537 574 Ptie and 4 537 616 Ptie of the Cadastre du Quebec in Brossard (Properties of the MtQ) |
Both English and French available |
Phase II Environmental Site Assessment 43 Lots of the Cadastre du Quebec (Properties of the city of Montreal) |
Both English and French available |
Phase I Environmental Site Assessment 43 Lots of the Cadastre du Quebec (Properties of the City of Montreal) |
English |
Phase II Environmental Site Assessment 13 Lots of the Cadastre du Quebec (Property of Infrastructure Canada) |
Both English and French available |
Phase I and II Environmental Site Assessment Lots 5 600 271, 4 537 690 and 5 701 948 of the Quebec Cadastre (Properties of the City of Brossard) / |
Both English and French |
Report on Investigations, Geotechnical Studies and Environmental Characterizations Volume 4 - Environment - Analytical Results and Chemical Analyses Certificates |
English |
Preliminary Engineering and Coordination Services: Requirements for the Environmental Management System (Lot 1 Task A5.8) |
English |
- Date modified: