Table 1: Engineering Reports
Title of Report Language of the Report

Integrating Design Considerations into the Contracting Process

French

Comparison of Observed Counts vs. Radar Counts

French

Champlain Bridge Count, Monthly (since March 2014)

French

Architectural Quality Report

English

Memorandum on Winter Suitability

English

Urban and Environmental Integration

Both English and French available

Preliminary Engineering and Coordination Services: Justification major bridge shoulder widths

English

Follow up report on the feasibility of recessed positioning of the luminaires on the NBSL towers to minimize visual impact of the luminaries.

English

Final Report P7006 - Preliminary Design Study for Intelligent Transportation and Tolling Systems

English

Geotechnical - Additional Investigations Report

Both English and French available

Count Station on Champlain Bridge

English

Preliminary Engineering and Co-ordination Services: Durability Report

English

Preliminary Engineering and Coordination Services: Temporary traffic management scenarios that require in-depth analysis (Lot 1 Task A4.4)

English

Preliminary Engineering and Coordination Services: Memorandum on Multiple-Use Path Configuration

English

Preliminary Engineering and Co-ordination Services: Major Bridges Final Report (Lot 3 Task A3.5)

English

Preliminary Engineering and Co-ordination Services: Highway Final Report (Lot 2 Task A2.5)

English

Preliminary Engineering and Coordination Services: Highway drainage report (Lot 2 Task A2.5)

English

Preliminary Engineering and Coordination Services: NBSL Corridor Project Constructability Report

English

Preparatory Study for Intelligent Transportation and Tolling Systems

English

Preparatory Study for Electrical and Lighting

English

Preliminary Engineering and Coordination Services: Preliminary Design and Cost Estimate Report - Major Bridges

English

Preliminary Engineering and Coordination Services: Preliminary highway design options and cost evaluation report (Task L2-A2.4)

English

Preliminary Engineering and Coordination Services: Interim Cost Review Report No. 2

English

Preliminary Engineering and Coordination Services:  Utilities in the NBSL Corridor

English

Final Report P7006 - Preliminary Design Study for Electrical and Lighting

English

Preliminary Engineering and Coordination Services: Design Progress Report

English

Preliminary Engineering and Coordination Services: Hydraulic Study

English

Ice Regime and Ice Loads on the Piers of the New Bridge

English

Results of Tests on the Concrete Barriers of the Champlain Bridge (2 reports)

English

Preliminary Engineering and Coordination Services: Highway Derogation Report (Lot 2 Task A2.5)

English

Preliminary Engineering and Coordination Services: Drainage of Major Bridges

English

Preliminary Engineering and Coordination Services: Inspection and Maintenance Report

English

Preliminary Engineering and Coordination Services: Pre-Project Implementation Plan Lot 1 Task A5.2

English

Report on Investigations, Geotechnical Studies and Environmental Characterizations Volume 1 - Investigation Report (Information Report)

English

Report on Investigations, Geotechnical Studies and Environmental Characterizations Volume 2 - Borehole Log Reports, Laboratory Tests, Structural Descriptions and Rock Photographies

English

Report on Investigations, Geotechnical Studies and Environmental Characterizations Volume 3 - Borehole Log Reports, Laboratory Tests, Structural Descriptions and Rock Photographies

English


Table 2: Financial Reports
Title of Report Language of the Report

New Bridge for St. Lawrence (Champlain): Public-Private Partnerships: A Best Practice Review across the Americas Issue 1

English

Business Case for New Bridge for the St. Lawrence Corridor (Champlain: Preliminary Design and Costing Report (5% Development)

English

Cost Estimation for Intelligent Transportation and Tolling Systems, Electrical and Lighting Reference Design

English

Preliminary Design & Cost Gap Analysis

English

Business Case for New Bridge for the St. Lawrence Corridor (Champlain) - Traffic Micro Simulation Model

English

Component 2 : Traffic and Revenue Forecasts

English

Component 2: Future Year Model Development (Activity 15)

English

Component 2: Data Collection and Methodology Report

English

Component 2: Base Year Model Development

English

Component 2: Traffic and Revenue Forecasts

English

Review of financing issues

English

New Bridge for the St. Lawrence project in Montreal (evaluation of structures)

English

Tolling Options for funding the federally owned Montreal Bridges: Preliminary Study

English

Analysis of tolling the Champlain and Jacques Cartier Bridges

English

Analysis of tolling the Jacques Cartier and Honore Mercier Bridges

English

Jacques Cartier & Honore-Mercier Preparatory Study for Tolling

English

Activity 4 Assessment of tolls and P3 options for other JCCBI structures in Montreal

English

New Bridge for the St. Lawrence Business Case

English


Table 3: Environment Reports
Title of Report Language of the Report

Cliff Swallow Management Plan for the New Bridge for the St. Lawrence Corridor

Both English and French available

Peregrine Falcon Management Plan for the New Bridge for the St. Lawrence Corridor

Both English and French available

Management Plan for the Northern Brownsnake in the Context of the Construction of a New Bridge for the St. Lawrence

Both English and French available

Follow-up report on the Northern Brownsnake in the Context of the Construction of a New Bridge for the St. Lawrence – Technical Report

French

Response Report on the Northern Brownsnake in the Context of the Construction of a New Bridge for the St. Lawrence

French

Site Research and Inventory for the Relocation of Rough Bugleweed in the New Bridge for the St. Lawrence Construction Area

French

Air Quality Assessment in the New Bridge for the St. Lawrence Corridor

Both English and French available

Air Quality Assessment in the New Bridge for the St. Lawrence Corridor

Both English and French available

Archeological Inventory (2014) New Bridge for the St. Lawrence Brossard Shore

French

Evaluation of Avian Habitat Loss Compensation Projects

French

Compensation Projects for Loss of Wetlands and Fish Habitat

French

Surface Water Sampling Program Final Report

English

Characterization Of Materials Likely To Contain Asbestos And Of Hazardous Materials/ 260 & 264 May Street, Montreal, Quebec

Both English and French available

Characterization Of Materials Likely To Contain Asbestos And Of Hazardous Materials 282 May Street, Montreal, Quebec

Both English and French available

Characterization Of Materials Likely To Contain Asbestos And Of Hazardous Materials 312 May Street, Montreal, Quebec 

Both English and French available

Characterization Of Materials Likely To Contain Asbestos And Of Hazardous Materials 314 May Street, Montreal, Quebec

Both English and French available

Characterization Of Materials Likely To Contain Asbestos And Of Hazardous Materials 318 May Street, Montreal, Quebec

Both English and French available

Characterization of materials likely to contain asbestos and of hazardous materials 274 May street, Montreal, Quebec

English

Characterization of materials likely to contain asbestos and of hazardous materials 268 May street, Montreal, Quebec

English

Characterization of materials likely to contain asbestos and of hazardous materials 270 May street, Montreal, Quebec

English

Characterization of materials likely to contain asbestos and of hazardous materials 262 May street, Montreal, Quebec

English

Characterization of materials likely to contain asbestos and of hazardous materials 276 May street, Montreal, Quebec

English

Characterization of materials likely to contain asbestos and of hazardous materials 320 May street, Montreal, Quebec

English

Characterization of materials likely to contain asbestos and of hazardous materials 3031 Rushbrooke street, Montreal, Quebec

English

Characterization of materials likely to contain asbestos and of hazardous materials 3000 LaSalle boulevard, Montreal, Quebec

English

Wind Monitoring at the Champlain Bridge, Montreal (3 reports)

English

Archeological Potential Study

French

Air Quality and Greenhouse Gas in the New Bridge for the St. Lawrence Project Study Area in 2012

French

Asbestos in the New Bridge for the St. Lawrence (NBSL) corridor

Both English and French available

Wind monitoring station installation and interim report

English

Assessment of Asbestos Presence in Soil NBSL Corridor and Adjacent Lots Greater Montreal, QC

Both English and French available

Greenhouse Gas Emissions Inventory Operational Phases Champlain Bridge and New Bridge for the St. Lawrence

French

In-water works restriction

English

Preliminary Engineering and Coordination Services: Review of Environmental Reports and Studies and Relevant Best Practice Guidelines (Lot 1 Task A5.1)

English

Preliminary Engineering and Coordination Services: Assessment of implications of using Envision on the NBSL Project

English

Qualitative risk assessment for the management of contaminated soils during construction of NBSL - Problem Formulation

Both English and French available

Qualitative risk assessment for the management of contaminated soils during construction of NBSL Management Plan

English

Stray and Induced Currents - Impact and Mitigation

English

Environmental property characterization – Phase II Lots 1 573 789 PTI and 4 122 344 PTIE - Montreal (Sud-Ouest Borough), Qc

French

Phase I and II Environmental Site Assessment Seven Lots ( 4 537 479, 4 537 494, 4 537 504, 4 537 487, 5 701 949, 4 537 574 Ptie and 4 537 616 Ptie of the Cadastre du Quebec in Brossard (Properties of the MtQ)

Both English and French available

Phase II Environmental Site Assessment 43 Lots of the Cadastre du Quebec (Properties of the city of Montreal)

Both English and French available

Phase I Environmental Site Assessment 43 Lots of the Cadastre du Quebec (Properties of the City of Montreal)

English

Phase II Environmental Site Assessment 13 Lots of the Cadastre du Quebec (Property of Infrastructure Canada)

Both English and French available

Phase I and II Environmental Site Assessment Lots 5 600 271, 4 537 690 and 5 701 948 of the Quebec Cadastre (Properties of the City of Brossard) /

Both English and French

Report on Investigations, Geotechnical Studies and Environmental Characterizations Volume 4 - Environment - Analytical Results and Chemical Analyses Certificates

English

Preliminary Engineering and Coordination Services: Requirements for the Environmental Management System (Lot 1 Task A5.8)

English

Date modified: