Office of Infrastructure of Canada Quarterly Financial Report for the quarter ended September 30, 2022

Statement outlining results, risks and significant changes in operations, personnel and programs

Introduction

This quarterly report has been prepared by management as required by Section 65.1 of the Financial Administration Act and in the form and manner prescribed by the Treasury Board.  This quarterly report should be read in conjunction with the Main Estimates as well as Budget 2022.

The key to building Canada for the 21st century is a strategic and collaborative long-term infrastructure plan that builds economically vibrant, strategically planned, sustainable and inclusive communities. Infrastructure Canada (INFC) works closely with all orders of government and other partners to enable investments in social, green, public transit and other core public infrastructure, as well as trade and transportation infrastructure.

Further information on INFC's mandate, responsibilities, and programs can be found in INFC's 2022-23 Main Estimates.

Basis of Presentation

This quarterly report has been prepared by management using an expenditure basis of accounting.  The accompanying Statement of Authorities includes INFC's spending authorities granted by Parliament and those used by INFC consistent with the Main Estimates and Supplementary Estimates for the 2022-23 fiscal year (FY).  This quarterly report has been prepared using a special purpose financial reporting framework designed to meet financial information needs with respect to the use of spending authorities.

The authority of Parliament is required before monies can be spent by the government.  Approvals are given in the form of annually approved limits through Appropriation Acts or through legislation in the form of statutory spending authority for specific purposes.

INFC uses the full accrual method of accounting to prepare and present its annual departmental financial statements that are part of the departmental performance reporting process.  However, the spending authorities voted by Parliament remain on an expenditure basis.

In the past, INFC has worked in collaboration with other federal departments and agencies to deliver some of its transfer payment programs (collectively known as federal delivery partners) and that remains accurate for the 2022-23 fiscal year. 

It should be noted that this quarterly report has not been subject to an external audit or review.

Highlights of Fiscal Quarter and Fiscal Year-to-Date Results

This section highlights the significant items that contributed to the change in resources available for use from 2021-22 to 2022-23 and in actual expenditures from 2021-22 to 2022-23 as at September 30th (second fiscal quarter).

Authorities

Graph 1: Comparison of Authorities Available as of September 30, 2021 and September 30, 2022

Bar graph showing the comparison of authorities available for use as of September 30, 2021 and September 30, 2022
Text description of Graph 1

Graph 1: Comparison of Authorities Available as of September 30, 2021 and September 30, 2022

Bar graph showing the comparison of authorities available for use as of September 30, 2021 and September 30, 2022.

  • Operating authorities available as of Q2 2021-22 were $193.9 million, compared with $251.3 million as of Q2 2022-23.
  • Capital authorities available as of Q2 2021-22 were $95.9 million, compared with $21.7 million as of Q2 2022-23. 
  • Contribution (Voted and Statutory) authorities available as of Q2 2021-22 were $9.56 billion, compared with $9.07 billion as of Q2 2022-23.        
  • Contributions to the Employee Benefit Plan authorities available as of Q2 2021-22 were $15.1 million, compared with $18.8 million as of Q2 2022-23. 
  • The total of authorities available for use as of Q2 2021-22 were $9.9 billion, compared with $9.4 billion as of Q2 2022-23. 

As shown in the Statement of Authorities, INFC's total authorities available for 2022-23 are $9.37 billion as of the end of Quarter 2 (Q2) and represent a $0.50 billion decrease compared to the same quarter in the prior year (PY).

This decrease is summarized in the table below:

Table 1: Year-to-date change in total authorities as of September 30, 2022

Authorities

Increase/(Decrease) vs. Prior Year-to-date (000's)

Operating Expenditures

57,469

Capital Expenditures

(74,195)

Contributions (Voted and Statutory)

(483,938)

Contributions to Employee Benefit Plans (EBP)

3,774

The sources of significant year-over-year changes are summarized as follows:

  • Operating Expenditures – The increase is due to funding received to deliver the new programs announced through the 2020 Fall Economic Statement and Budget 2021 as well as the mandated transfer of the Housing and Homelessness portfolio under the responsibility of Minister Hussen from the Department of Employment and Social Development (ESDC) to Infrastructure Canada.
  • Capital Expenditures – The decrease in capital funding is related to sunsetting funding in 2021-22 for land purchases tied to the Gordie Howe International Bridge project and to the Samuel de Champlain Bridge Corridor project which is scheduled to complete in late 2022.
  • Contributions (Voted and Statutory) – The net decrease is attributable to the Canada Community Building Fund top-up sunsetting in 2021-22 and offset by an increase tied to new programming, the addition of Reaching Home: Canada's Homelessness Strategy as well as other existing programs.
  • Contributions to Employee Benefit Plans – This increase is reflective of the growth in full time equivalents (FTEs) associated with the new Programs listed in the Operating Expenditures section and INFC's expanded mandate.

Expenditure Analysis

Expenditures at the end of Q2 were $2.40 billion, compared to $5.47 billion reported in the same period of 2021-22, representing an decrease of 56% between Q2 of the two years. The source of the relative decrease is demonstrated in the tables, graphs and analysis below.

Graph 2: Comparison of Total Expenditures as of September 30, 2021 and September 30, 2022

Bar graph showing the comparison of total expenditures used year-to-date as of September 30, 2021 and September 30, 2022
Text description of Graph 2

Graph 2: Comparison of Total Expenditures as of September 30, 2021 and September 30, 2022

Bar graph showing the comparison of total expenditures used year-to-date as of September 30, 2021 and September 30, 2022.

  • Authorities used for Operating as of Q2 2021-22 were $88.7 million, compared with $104.3 million as of Q2 2022-23. 
  • Authorities used for Capital as of Q2 2021-22 were $6.6 million, compared with $4.6 million as of Q2 2022-23.         
  • Authorities used for Contributions (Voted and Statutory) as of Q2 2021-22 were $5.4 billion compared with $2.3 billion as of Q2 2022-23. 
  • Authorities used for Contributions to the Employee Benefit Plan as of Q2 2021-22 were $5.3 million, compared with $9.4 million as of Q2 2022-23. 
  • Total year-to-date budgetary expenditures as of Q2 2021-22 were $5.5 billion, compared to $2.4 billion as of Q2 2022-23.
Table 2: Change in year-to-date expenditures as of September 30, 2022

Year-to-date expenditures

Increase/(Decrease) vs. Prior Year-to-date (000's)

Operating Expenditures

15,636

Capital Expenditures

(2,059)

Contributions (Voted and Statutory)

(3,091,420)

Contributions to Employee Benefit Plans

4,128

The sources of significant year-over-year changes are summarized as follows:

  • Operating and Capital Expenditures – Further details by standard object are provided in table 4 later in this report.
  • Contributions (Voted and Statutory) – Further details by program are provided in table 3 below.
  • Contributions to Employee Benefit Plans – The increase in INFC's contribution to the Employee Benefit Plan is directly attributable to an increase in the number of full-time equivalents (FTEs) currently employed at INFC.

Graph 3: Comparison of Authorities used for Contributions (Voted and Statutory) as of September 30, 2021 and September 30, 2022

Bar graph showing the comparison of authorities used for Contributions (Voted) and Contributions (Statutory) as of September 30, 2021 and September 30, 2022
Text description of Graph 3

Graph 3: Comparison of Authorities used for Contributions (Voted and Statutory) as of September 30, 2021 and September 30, 2022

Bar graph showing the comparison of authorities used for Contributions (Voted) and Contributions (Statutory) as of September 30, 2021 and September 30, 2022.

  • Contributions expensed as of Q2 2021-22 were $2.8 billion, compared with $1.7 billion as of Q2 2022-23. 
  • Total year-to-date contributions expensed as of Q2 2021-22 were $5.4 billion, compared with $2.3 billion as of Q2 2022-23. 

Table 3 below shows the most significant changes in year-to-date contribution expenditures by program between September 2021 and September 2022:

Table 3: Change in year-to-date expenditures by contribution program as of September 30, 2022

Program Fund

Increase/(Decrease) vs. Prior Year-to-date (000's)*

Reaching Home (RH)

498,912

Investing in Canada Infrastructure Program - COVID-19 Resilience Stream (ICIP – CVRIS)

122,970

Disaster Mitigation and Adaptation Fund (DMAF)

37,114

New Building Canada Fund-Provincial-Territorial Infrastructure Component-Small Communities Fund (NBCF-PTIC-SCF)

(17,745)

Building Canada Fund-Major Infrastructure Component (BCF-MIC)

(17,996)

Investing in Canada Infrastructure Program - Public Transit Infrastructure Stream (ICIP - PTIS)

(24,695)

Clean Water Wastewater Fund (CWWF)

(36,500)

Public Transit Infrastructure Fund (PTIF)

(107,823)

New Building Canada Fund-Provincial-Territorial Infrastructure Component-National and Regional Projects (NBCF-PTIC-NRP)

(211,298)

Canada Community-Building Fund (CCBF)

(3,355,599)

*Note: The table shows the most significant changes which account for a net decrease of $3.11B of the total $3.09B year to date change.

The sources of significant year-over-year changes are summarized as follows:

  • Reaching Home (RH) RH is a new program transferred from Employment and Social Development Canada (ESDC) to Infrastructure Canada (INFC) at the beginning of this fiscal year. There was no spending by 2nd quarter at INFC last year.
  • Investing in Canada Infrastructure Program - COVID-19 Resilience Stream (ICIP – CVRIS) - With projects well underway, the CVRIS stream of ICIP has received more claims by the 2nd quarter of FY2022-23, particularly from Quebec and Alberta.
  • Disaster Mitigation and Adaptation Fund (DMAF) – The increase is due to more claims received by September 2022, particularly from Alberta, Ontario and Quebec.
  • New Building Canada Fund-Provincial-Territorial Infrastructure Component-Small Communities Fund (NBCF-PTIC-SCF) – fewer claims have been received by 2nd quarter of FY2022-23.
  • Building Canada Fund-Major Infrastructure Component (BCF-MIC) – Fewer claims have been received for this sunsetting program by the 2nd quarter of FY2022-23.
  • Investing in Canada Infrastructure Program - Public Transit Infrastructure Stream (ICIP - PTIS) –  Decrease mainly due to reduced claims in the Quebec region, offset by a slight increase in the West region, based on progress of Public Transit projects across Canada.
  • Clean Water Wastewater Fund (CWWF) – PTIF and CWWF are coming to the end of their life cycle with the majority of projects approaching completion by 2023-24.
  • New Building Canada Fund-Provincial-Territorial Infrastructure Component-National and Regional Projects (NBCF-PTIC-NRP) – Compared to FY2021-22, fewer claims have been received by the 2nd quarter of FY2022-23.
  • Canada Community-Building Fund (CCBF) – $3.4B decrease is a result of two factors. First, a $2.2B top-up payment was released by 2nd quarter in FY2021-22 in addition to the regular CCBF annual payment.  Second, FY2021-22 payments were provided in one lump-sum at the beginning of year instead of the regular biannual schedule due to the pandemic. CCBF payments are back to a regular schedule in FY2022-23. Only the first half of the payments have been made by 2nd quarter of FY2022-23.

Departmental Budgetary Expenditures by Standard Object

The planned Departmental Budgetary Expenditures by Standard Object are set out in the table at the end of this report. Aggregate year-to-date expenditures in 2022-23 decreased by $3.1 billion, compared with the same quarter last year. The largest single factor was an decrease in transfer payments as explained above.

A breakdown of variances in year-to-date spending by standard object is below:

Table 4: Change in year-to-date expenditures by standard object as of September 30, 2022

Changes to Expenditures by Standard Object

Increase/(Decrease) vs. Prior Year-to-date (000's)

Personnel

22,202

Transportation and communications

(16)

Information

61

Professional and special services

(5,949)

Rentals

289

Repair and maintenance

235

Utilities, materials and supplies

22

Acquisition of land, buildings and works

187

Acquisition of machinery and equipment

857

Transfer payments

(3,091,420)

Public debt charges

(187)

Other subsidies and payments

5

The sources of significant year-over-year changes are summarized as follows:

  • Personnel – Increase in the number of employees associated with new Programs and the mandated transfer of the Housing and Homelessness portfolio.
  • Professional and special services – The decrease is mainly due to engineering consultation costs related to payments for the Réseau Express Métropolitain (REM) project which are reimbursed based on an agreement between REM Inc, and INFC.
  • Transfer payments Details were previously discussed.
  • Acquisition of machinery and equipment – Increase due to the purchase of computer equipment to accommodate the new employees.

Overall, INFC has spent 26% of its current Total Authorities as of September 30, 2022, compared to 56% at the end of Q2 of the previous fiscal year.

Risks and Uncertainties

As part of the Department's corporate risk management function, the Department regularly monitors and identifies strategic risks that may affect the delivery of the Department's mandate and expected results. INFC integrates risk management principles into strategic business planning, results-based management, decision-making and organizational processes to support the achievement of departmental priorities. Risk management at INFC is carried out in accordance with the Treasury Board Secretariat's (TBS) Framework for the Management of Risk, TBS's Guide to Integrated Risk Management, the Management Accountability Framework, and INFC's Integrated Risk Management policy.

One of the Department's key financial risks pertains to INFC's capacity to establish sustainable tools and processes for decision-making on the Flow of Funding.

There are many steps between when funding is announced in the budget and project construction starts that impact the flow of funding. In most cases, INFC funds projects via a Contribution Agreement with the ultimate recipient or Integrated Bilateral Agreement between Canada and a Provincial/Territorial (PT) government. PT governments then enter into their own agreements with municipalities, who are ultimately responsible for project management and construction of the infrastructure. Most of INFC's programs are structured in such a way that funding flows from the Department based on requests for reimbursements.  It is important to note that federal spending is not an accurate measure of when the economic activity created by infrastructure spending occurs.  When projects are approved, work begins and economic activity is generated by provinces, territories and municipalities, which are responsible for implementing projects and incurring costs.  INFC makes the federal contribution only when requested by partners.

There may be delays between when infrastructure activity occurs and when INFC is able to flow funds which is when recipients submit their claims. The ongoing misalignment between authorities and expenditures can result in delays in flowing federal funding. There are a variety of reasons that can affect the timing of requests for reimbursements, which can contribute to a variance between planned spending and actual spending. Some projects, once approved, move quickly into the construction phase while others have longer lead times for planning, and local approval processes (e.g. zoning and permitting).  Regardless of how long planning takes or how soon ground can break, eligible costs can be submitted for reimbursement throughout the life of the project. INFC encourages PTs to submit claims in a timely manner to ensure the flow of funding as planned. Parliamentary authority to spend typically expires at the end of the fiscal year; however, in response to the needs of its project partners, INFC reprofiles its authorities as needed so that the funding committed to specific projects continues to be available in future years when needed.

INFC is ramping up its capacity to manage the recent addition of a new mandate and GoC priority (Housing and Homelessness). This is coupled with the rapid growth  of the Department's programming in the last few years as INFC has launched an unprecedented number of new programming in 2021 and new recently approved programs through the 2021 Fall Economic Statement and Budget 2022. The latter brought with it the decision to expedite the delivery of ICIP. All these changes could have a potential impact on  both the flow of funding and the anticipated workload.

INFC has worked with provinces and territories to introduce improvements to the flow of funding processes to better align authorities of existing programs to expenditures and improve predictability of high materiality projects. It also used lessons learned from legacy programs to introduce additional flexibilities in the design of new programs such as flexibility in funding mechanism and basis of payments.  Further, mandatory biannual reporting requirements and claim frequencies are being directly imbedded within agreement templates for new programs which will likely accelerate the claims process once agreements are approved and improve forecasting accuracy. These efforts should yield important impacts over the coming years.

Significant Changes in Relation to Operations, Personnel and Programs

Infrastructure Canada continues to grow and evolve. Since the last Quarterly Financial Report, the following significant change has taken place within the department:

  • INFC secured an additional $7M over 2 years to further advance the High Frequency Rail (HFR) project that proposes to build a 1000+ kilometer (km) intercity passenger rail network on mostly dedicated tracks in Canada's busiest and densest travel corridor, as well as allow for small strategic studies/projects to protect the future HFR route.

INFC is committed to making infrastructure investments that support economic growth and job creation, help combat the effects of climate change, and build inclusive communities. While COVID-19 has not changed these priorities, the Department is focused on doing more with its existing resources and building back better. As current programs are adapted and a suite of new programming is launched, resource management practices and sound financial stewardship are key and center in ensuring successful delivery. Although recipients continue to experience constraints resulting from COVID-19 which affect the implementation of new projects, INFC is committed to provide funding to them in a timely fashion.

Therefore INFC is focusing efforts on attracting and retaining employees with the skill sets and experience necessary to fulfil the department's evolving mandate, and on implementing additional flexibilities to allow provinces and territories more time for the completion of projects under several programs. For example, the ICIP COVID-19 stream has been extended to allow projects by provinces to be completed by December 31st, 2023 and projects in the territories and in remote communities must be completed by December 31st, 2024.

Approval by Senior Officials

Approved by:

 

 

Kelly Gillis
Deputy Head
Signed at Ottawa, Canada

 

 

Nathalie Bertrand
Chief Financial Officer

Office of Infrastructure Canada
Quarterly Financial Report
For the quarter ended September 30, 2022

Departmental budgetary expenditures by Standard Objects (unaudited)
(in thousands of dollars)

Fiscal year 2022-23

N/A Planned expenditures
for the year ending
March 31, 2023
Expended during the
quarter ended
September 30, 2022
Year-to-date used
at quarter-end
Expenditures:
Personnel 144,540 36,381 67,983
Transportation and communications 1,190 269 390
Information 949 217 303
Professional and special services 65,028 14,963 19,683
Rentals 4,930 289 1,115
Repair and maintenance 13,172 4,251 7,108
Utilities, materials and supplies 98 17 32
Acquisition of land, buildings and works 11,206 1,767 2,931
Acquisition of machinery and equipment 3,040 741 986
Transfer payments 9,074,320 1,704,734 2,277,297
Public debt charges 47,744 10,678 17,810
Other subsidies and payments - - 4
Total net budgetary expenditures 9,366,217 1,774,308 2,395,642

Departmental budgetary expenditures by Standard Objects (unaudited)
(in thousands of dollars)

Fiscal year 2021-22

N/A Planned expenditures
for the year ending
March 31, 2022
Expended during the
quarter ended
September 30, 2021
Year-to-date used
at quarter-end
Expenditures:
Personnel 103,182 24,709 45,781
Transportation and communications 1,907 375 407
Information 605 142 242
Professional and special services 51,522 2,578 25,631
Rentals 2,607 396 826
Repair and maintenance 41,616 4,336 6,873
Utilities, materials and supplies 340 5 10
Acquisition of land, buildings and works 70,346 1,650 2,744
Acquisition of machinery and equipment 2,344 84 129
Transfer payments 9,558,259 2,838,856 5,368,717
Public debt charges 30,379 10,795 17,996
Other subsidies and payments - (1) (1)
Total net budgetary expenditures 9,863,107 2,883,925 5,469,356

Download

If the following document is not accessible to you, please contact info@infc.gc.ca for assistance.

  • Departmental budgetary expenditures by Standard Objects (PDF version) (21.36 KB)

Office of Infrastructure Canada
Quarterly Financial Report
For the quarter ended September 30, 2022

Statement of Authorities (unaudited)
(in thousands of dollars)

Fiscal Year 2022-23

N/A Total available
for use for the
year ending
March 31, 2023
Used during the
quarter ended
September 30, 2022
Year-to-date
used at
quarter-end
Vote 1 – Operating expenditures 251,171 61,673 104,295
Vote 5 – Capital expenditures 21,713 3,170 4,589
Vote 10 – Contributions 6,805,354 570,251 1,142,814
Budgetary Statutory Authorities
(S) – Contributions to employee benefit plans 18,829 4,707 9,414
(S) – Canada Community-Building Fund 2,268,967 1,134,483 1,134,483
(S) – Minister salary and car allowance 185 23 46
Total Budgetary Authorities 9,366,217 1,774,308 2,395,642
Non-Budgetary Authorities - - -
Total Authorities 9,366,217 1,774,308 2,395,642

Statement of Authorities (unaudited)
(in thousands of dollars)

Fiscal Year 2021-22

N/A Total available
for use for the
year ending
March 31, 2022
Used during the
quarter ended
September 30, 2021
Year-to-date
used at
quarter-end
Vote 1 – Operating expenditures 193,796 38,946 88,663
Vote 5 – Capital expenditures 95,908 3,462 6,648
Vote 10 – Contributions 5,068,176 617,740 878,635
Budgetary Statutory Authorities
(S) – Contributions to employee benefit plans 15,054 2,643 5,286
(S) – Canada Community-Building Fund 4,490,082 2,221,116 4,490,082
(S) – Minister salary and car allowance 91 18 41
Total Budgetary Authorities 9,863,107 2,883,925 5,469,356
Non-Budgetary Authorities - - -
Total Authorities 9,863,107 2,883,925 5,469,356

Download

If the following document is not accessible to you, please contact info@infc.gc.ca for assistance.