Canada – British Columbia Integrated Bilateral Agreement for the Investing in Canada Infrastructure Program Amending Agreement no. 1

This Amending Agreement No.1 is made as of the date of last signature

BETWEEN: HER MAJESTY THE QUEEN IN RIGHT OF CANADA, as represented by the Minister of Infrastructure and Communities (“Canada”)

AND: HER MAJESTY THE QUEEN IN RIGHT OF BRITISH COLUMBIA, as represented by the Minister of Transportation and Infrastructure and the Minister of Municipal Affairs & Housing (“British Columbia”)

individually referred to as a “Party” and collectively referred to as the “Parties”.

WHEREAS the Minister of Infrastructure and Communities is responsible for the Program entitled the Investing in Canada Infrastructure Program (ICIP);

WHEREAS the Parties entered into an Agreement dated March 22, 2018, setting out the terms and conditions for Canada's contribution under the Canada-British Columbia Integrated Bilateral Agreement for the ICIP (“the Agreement”);

WHEREAS the Parties wish to amend the Agreement to reflect changes made to the ICIP (“Amending Agreement No. 1”), including the creation of a new COVID-19 resilience infrastructure stream to support pandemic response and economic recovery efforts;

NOW THEREFORE, in accordance with the mutual covenants and agreements herein, the Parties agree as follows:

1. Amendments to the Agreement

1.1 The definition of “Asset Disposal Period” in section 1.1 (Definitions) is deleted and replaced by:

Asset Disposal Period”, unless otherwise agreed to by Canada, means the period ending five (5) years after a Project is Substantially Completed for any Asset other than land purchased or acquired, in whole or in part, by the Ultimate Recipient with contribution funding provided by Canada under the terms and conditions of this Agreement. For any Asset that is land purchased or acquired, in whole or in part, by the Ultimate Recipient with contribution funding provided by Canada under the terms and conditions of this Agreement, it means the period ending forty (40) years after a Project is Substantially Completed.

1.2 The definition of “Eligible Expenditures” in section 1.1 (Definitions) is deleted and replaced by:

Eligible Expenditures” mean those costs Incurred and eligible for payment by Canada as set out in section A.2 c) (Eligible Expenditures).

1.3 The following definitions are added to section 1.1 (Definitions):

Construction Start” means the performance of physical activities on the property which results in changes which are visible to any person inspecting the site and are recognizable as the initial steps for the preparation of the land or the installation of improvements of fixtures, unless otherwise approved by Canada.

Fair Market Value” means the price that a property would likely bring in a competitive and open market on a specified date under all conditions required for a fair sale, with the buyer and seller each acting prudently and knowledgeably, and where the price is not affected by undue stimulus.

Indigenous Governing Body” means a council, government or other entity that is authorized to act on behalf of an Indigenous group, community or people that holds rights recognized and affirmed by section 35 of the Constitution Act, 1982. “Indigenous peoples of Canada” has the meaning assigned by the definition of aboriginal peoples of Canada in subsection 35(2) of the Constitution Act, 1982.

Natural Infrastructure” means the use of naturally occurring resources or the engineered use of natural resources to provide adaptation or mitigation services to the gradual and/or sudden impacts of climate change or natural hazards.

Remote Community” or “Remote Communities” means a permanent community with a population less than 10,000 that is approximately greater than 4 hours ground travel under normal conditions from an urban service centre, with limited access, whether by road, air, or water, resulting in unreliable or lack of year-round service delivery of internet and telecommunications, grid-tied electricity or natural gas, contributing to increased costs or delay of goods and services* such as healthcare, fuel, food, and construction materials. Urban service centres include Prince George, Fort. St. John, Dawson Creek, Kamloops, Kelowna, Nanaimo, Capital Regional District, and Lower Mainland.

Regional Government” means a regional district that has been established by or under a provincial statute, or the electoral area within a regional district that:

  1. Provides local services and acts as a general local government to unincorporated communities; or,

  2. Provides regional services.

1.4 The definition of “Ultimate Recipient” in section 1.1 (Definitions) is deleted and replaced by:

Ultimate Recipient” means an entity identified under section A.2 a) (Ultimate Recipients) that is eligible to receive contribution funding for a Project under this Agreement.

1.5 Section 3 (Commitments by Canada) is deleted and replaced by:

  • 3. Commitments by Canada

    1. Canada agrees to provide contribution funding to British Columbia for each of the Program's contribution streams in an amount outlined in Schedule A.1 (Contribution Funding) and to be paid in accordance with Sections A.2, A.3, A.4 A.5, A.6 and A.7, of Schedule A, as applicable. The total amount of contribution funding provided to British Columbia by Canada under all streams taken together of this Agreement will be up to three billion, nine hundred seventeen million, three hundred eighty thousand, one hundred and sixty-one dollars ($3,917,380,161).
    2. Upon request by British Columbia and subject to approval by Canada, Canada may transfer up to a maximum of four hundred twelve million, nine hundred sixty-eight thousand, and sixteen dollars ($412,968,016) from its contribution funding under Sections A.1 a) i. through A.1 a) iv. of Schedule A to the COVID-19 resilience infrastructure stream as set out under Section A.1 a) v. of Schedule A. Any such transfers will be governed in accordance with Sections A.2 (General Program Requirements) and A.7 (COVID-19 Resilience Infrastructure) of Schedule A.
    3. Canada agrees to provide a portion of Canada's total contribution funding identified in Sections A.1 a) i. through A.1 a) iv. of Schedule A.1 (Contribution Funding) to British Columbia for Administrative Expenses to be paid in accordance with section 16 (Administrative Expenses).
    4. The Parties acknowledge that Canada's role in a Project is limited to making a financial contribution to British Columbia for that Project and that Canada will have no involvement in the implementation of that Project or its operation. Canada is neither a decision-maker nor an administrator of a Project. When Canada's approval is required, Canada acknowledges that time is of the essence.

1.6 Paragraph c) of Section 4 (Commitments by British Columbia) is deleted and replaced by:

  1. For Projects funded under the public transit stream, the green infrastructure stream, the community, culture and recreation infrastructure stream, and the rural and northern communities infrastructure stream British Columbia will secure assurances that all Projects are Substantially Completed by October 31st, 2027. For Projects funded under the COVID-19 resilience infrastructure stream, British Columbia will secure assurances that all Projects are Substantially Completed by December 31st, 2021, or by December 31st, 2022 if the Project is in a Remote Community.

1.7 Paragraph g) i. of Section 4 (Commitments by British Columbia) is deleted and replaced by:

  1. A greenhouse gas emissions assessment that includes a cost-per-tonne calculation as required by Canada:
    1. for all projects that seek funding under the climate change mitigation sub-stream in Section A.4 (Green Infrastructure) of Schedule A; and
    2. for all other projects with total estimated Eligible Expenditures over ten million dollars ($10,000,000).

1.8 Paragraph g) ii. of Section 4 (Commitments by British Columbia) is deleted and replaced by:

  1. A climate change resilience assessment:
    1. for all projects that seek funding under the adaptation, resilience, and disaster mitigation sub-stream in Section A.4 (Green Infrastructure) of Schedule A; and
    2. for all other projects with total estimated Eligible Expenditures over ten million dollars ($10,000,000).

1.9 Paragraph h) of Section 4 (Commitments by British Columbia) is deleted and replaced by:

  1. British Columbia will ensure that all Projects with total estimated Eligible Expenditures of twenty five million dollars ($25,000,000) or more, will report on community employment benefits provided to at least three (3) federal target groups (apprentices, Indigenous peoples, women, persons with disabilities, veterans, youth, new Canadians, or small-medium-sized enterprises and social enterprises), except for planning Projects, as set out in paragraph ii) of Section A.2 b) (Eligible Projects) of Schedule A. Canada will waive the community employment benefits reporting requirement at the discretion of British Columbia. British Columbia will provide Canada a rationale for not reporting on community employment benefits as described in this section, which will be made public by Canada.

1.10 Paragraph i) of Section 4 (Commitments by British Columbia) is deleted and replaced by:

  1. Unless otherwise agreed to by Canada, for each stream except the COVID-19 resilience infrastructure stream, British Columbia agrees to provide a total funding contribution that is no less than 33.33% of total Eligible Expenditures of the sum of Projects funded where the Ultimate Recipient is a local or Regional Government, as described in Section A.2 a) (Ultimate Recipients) of Schedule A.

1.11 Paragraph j) of Section 4 (Commitments by British Columbia) is deleted and replaced by:

  1. British Columbia will allocate a minimum of twenty-two million five hundred sixty-four thousand two hundred sixty-nine dollars ($22,564,269) from the community, culture and recreation infrastructure contribution funding allocation under Section A.1 a) iii. of Schedule A.1 (Contribution Funding) or the COVID-19 resilience infrastructure contribution funding allocation under Section A.1 a) v. of Schedule A.1 (Contribution Funding) to Projects for the benefit of Indigenous peoples not living on reserve.

1.12 Paragraph k) of Section 4 (Commitments by British Columbia) is deleted and replaced by:

  1. Over the term of this Agreement, British Columbia will ensure that contribution funding received under this Agreement, except for contribution funding received under the COVID-19 resilience infrastructure stream under Section A.1 a) v. of Schedule A.1 (Contribution Funding), does not displace British Columbia infrastructure spending on each of the asset classes funded through the Program.

1.13 Paragraph o) of Section 4 (Commitments by British Columbia) is deleted and replaced by:

  1. British Columbia will submit for Canada's review and approval all projects to be considered for contribution funding under the public transit stream, the green infrastructure stream, the community, culture and recreation infrastructure stream, and the rural and northern communities infrastructure stream by March 31st, 2025. British Columbia will submit for Canada's review and approval all projects to be considered for contribution funding under the COVID-19 resilience infrastructure stream by March 31, 2021, unless otherwise agreed to by Canada.

1.14 Paragraph p), q), r) and s), as set out below, are added to section 4 (Commitments by British Columbia):

  1. British Columbia may allocate a maximum of thirty-nine million, one hundred seventy-three thousand, eight hundred and two dollars ($39,173,802) to planning Projects from the sum of Canada's contribution funding under Sections A.1 a) i. through iv. taken together of Schedule A.1 (Contribution Funding), in accordance with paragraph ii) of Section A.2 b) (Eligible Projects) of Schedule A.
  2. British Columbia may allocate a maximum of twenty-four million, eight hundred thirty seven thousand, eight hundred and fifty-five dollars ($24,837,855) from the green infrastructure stream contribution funding allocation under Section A.1 a) ii. of Schedule A.1 (Contribution Funding) to land acquisition expenditures, in accordance with paragraph v) of Section A.2 c) (Eligible Expenditures) of Schedule A.
  3. British Columbia will ensure that any Asset that is land purchased or acquired, in whole or in part, with contribution funding provided by Canada under the terms and conditions of this Agreement will be used as Natural Infrastructure for the Asset Disposal Period.
  4. British Columbia acknowledges that for any Project with a federally required Construction Start date of September 30th, 2021, as set out in A.3 f) ii., A.4 f) i. b), A.4 f) ii. e), A.6 e) i. c), , and A.7 e) iii., if Construction Start for the Project does not occur by September 30th, 2021 Canada will cancel the Project under this Agreement and return Canada's approved contribution funding for the Project to the stream under which the Project was originally funded.

1.15 Section 6 (Fiscal Year Budgeting) is deleted and replaced by:

  • 6. Fiscal Year Budgeting

    1. The amount of contribution funding payable by Canada each Fiscal Year is set out in section A.1 b) of Schedule A (Program Details).
    2. If the actual amount payable by Canada in respect of any Fiscal Year is less than the estimated maximum amounts in section A.1 b) of Schedule A (Program Details), British Columbia may request that Canada re-allocate the difference between the two amounts to a subsequent Fiscal Year. Subject to section 5 (Appropriations), Canada agrees to make reasonable efforts to accommodate British Columbia's request. British Columbia acknowledges that requests for re-allocation of Canada's contribution funding to a Project will require appropriation adjustments or federal Crown approvals.
    3. In the event that any requested re-allocation of Canada's contribution funding to a Project is not approved, the amount of Canada's contribution payable in accordance with Section 3 (Commitments by Canada) and section A.1 a) of Schedule A (Program Details) may be reduced by the amount of the requested re-allocation. If the contribution payable by Canada in accordance with section A.1 a) of Schedule A (Program Details) is so reduced, the Parties agree to review the effects of such reduction on the overall implementation of the Project and to adjust the terms and conditions of this Agreement as appropriate.

1.16 Paragraph a) of Section 8 (British Columbia Investing in Canada Infrastructure Program Infrastructure Plan) is deleted and replaced by:

  1. Unless otherwise agreed to by Canada, British Columbia will submit to Canada by September 30th, 2018 and will update and re-submit to Canada annually by May 31st an infrastructure plan, to the satisfaction of both Parties, that includes:
    1. A section that describes British Columbia's approach and priorities for the Program, including but not limited to British Columbia's plans for achieving the targets outlined in Schedule C (Targets), British Columbia's approach for meeting the commitments in paragraphs m) and n) of section 4 (Commitments by British Columbia) to ensure that a fair balance of local government and provincial projects are submitted for Canada's approval and that projects supporting Indigenous peoples are considered for contribution funding under this Agreement, and British Columbia's aspirational targets for community employment benefits provided to federal target groups (apprentices, Indigenous peoples, women, persons with disabilities, veterans, youth, new Canadians, or small-medium-sized enterprises and social enterprises);
    2. A section identifying projects that British Columbia intends to submit for approval by Canada for contribution funding under this Agreement, including projects that are ready to be submitted to Canada or that British Columbia may submit to Canada in the future; and
    3. For all updated infrastructure plans, information on accomplishments in the previous Fiscal Year.

1.17 Paragraph c) of Section 8 (British Columbia Investing in Canada Infrastructure Program Infrastructure Plan) is deleted and replaced by:

  1. Unless otherwise agreed to by Canada, all infrastructure plans submitted to Canada will cover a minimum period of the current Fiscal Year and the next two (2) Fiscal Years, up to the Agreement End Date.

1.18 Paragraph f) of Section 8 (British Columbia Investing in Canada Infrastructure Program Infrastructure Plan) is deleted and replaced by:

  1. The submission of any British Columbia infrastructure plan to both Parties' satisfaction does not constitute approval of projects by Canada under this Agreement. British Columbia may submit projects for approval by Canada in accordance with section 9.1 (Project Submission and Approval) that are not included on a submitted infrastructure plan.

1.19 Paragraph a) of Section 9.1 (Project Submission and Approval) is deleted and replaced by:

  1. British Columbia will be responsible for identifying and prioritizing eligible projects, and will engage with local and Regional Governments, public sector bodies and Indigenous peoples as described in section A.2 a) of Schedule A (Ultimate Recipients), and submitting eligible projects to Canada for approval.

1.20 Paragraph c) of Section 9.1 (Project Submission and Approval) is deleted and replaced by:

  1. British Columbia will provide all information required by Canada, to the satisfaction of both Parties, for each project submitted by British Columbia for contribution funding under this Agreement, including but not limited to:
    1. when applicable, as determined by Canada, the target to which the project is aligned as outlined in Schedule C (Targets);
    2. expected results for community employment benefits for all projects to which the community employment benefit reporting requirement outlined in paragraph h) of section 4 (Commitments by British Columbia) applies;
    3. when applicable in accordance with section 4 g), climate lens assessments; and
    4. an attestation in a format acceptable to Canada from a delegated official that the information in the project submission is accurate.

1.21 Paragraph g) of Section 9.1 (Project Submission and Approval) is deleted and replaced by:

  1. Canada will promptly inform British Columbia in writing, through an approval letter, once Projects have been approved. This approval letter forms part of this Agreement.

1.22 Section 10 (Federal Requirements for Projects) is deleted and replaced by:

  • 10. Federal requirements for projects

    In addition to the requirements for eligible Projects as set out in Schedule A (Program Details), eligible Projects, except for planning Projects as set out in paragraph ii) of section A.2 b) (Eligible Projects) of Schedule A, must also meet the following requirements:

    1. A Project must meet or exceed any applicable energy efficiency standards for buildings outlined in the Pan-Canadian Framework on Clean Growth and Climate Change.
    2. A Project must meet or exceed the requirement of the highest published accessibility standard in a jurisdiction in addition to applicable provincial building codes and relevant municipal by-laws.

1.23 Section 14 (Reporting) is deleted and replaced by:

  • 14. Reporting

    1. Unless otherwise agreed to by Canada, British Columbia will submit to Canada, no later than May 31st and November 30th each Fiscal Year, a Project progress report to both Parties' satisfaction that includes all Projects except:
      1. Projects where an Ultimate Recipient is a community with a population of less than five thousand (5,000) people, which will be included in the Project progress report submitted to Canada, no later than November 30th each Fiscal Year; and
      2. Projects funded under the COVID-19 resilience infrastructure stream, which will be included in the Project progress report submitted to Canada no later than February 28th, May 31st, August 31st, and November 30th each Fiscal Year.
    2. For Projects funded under the public transit stream, the green infrastructure stream, the community, culture and recreation infrastructure stream, and the rural and northern communities infrastructure stream, each Project progress report will include an attestation in a format acceptable to both Parties, from a delegated official, that the information in the report is accurate.
      1. The Project progress report will include the following updated information for each Project:
        1. Canada's contribution funding to the Project by Fiscal Year;
        2. Construction Start and end dates (forecasted/actual);
        3. Progress tracker (e.g. percent completed);
        4. Risks and mitigation strategies, as required;
        5. Confirmation that the Project is on track to achieve expected results, or if Substantially Completed, confirmation of actual results; and
        6. Confirmation of installed Project signage, if applicable.
    3. For Projects funded under the COVID-19 resilience infrastructure stream, each Project progress report will include a claim, in accordance with section 15 (Claims and Payments), and an attestation in a format acceptable to both Parties, from a delegated official, that the information in the report is accurate and that Eligible Expenditures have been Incurred in accordance with this Agreement.
      1. Each Project progress report will include the following information for each Project:
        1. Estimated total Eligible Expenditures
        2. Total Eligible Expenditures to date
        3. Progress tracker (e.g. percent completed)
        4. Construction Start and end dates (forecasted/actual)
        5. Confirmation of installed Project signage, if applicable
    4. British Columbia will report annually, no later than November 30th, through the Project progress report, or through existing provincial reporting frameworks, on expected and actual results related to community employment benefits for applicable Projects.
    5. For all Projects funded under the public transit stream, the green infrastructure stream, the community, culture and recreation infrastructure stream, and the rural and northern communities infrastructure stream, British Columbia will complete all reporting requirements as defined under paragraphs a), b) and d) in this section, to Canada's satisfaction, no later than December 31st, 2027. For Projects funded under the COVID-19 resilience infrastructure stream, British Columbia will complete all reporting requirements as defined under paragraphs a) and c) in this section, to Canada's satisfaction, no later than July 31st 2022, or July 31st 2023 for Projects in Remote Communities.
    6. British Columbia agrees and will ensure that Canada may use the information submitted by British Columbia under this section to publicly report on Program results.

1.24 Section 15.1 (Claims and Payments) is deleted and replaced by:

  • 15.1 Claims and payments

    1. British Columbia will submit to Canada, no later than April 20th each Fiscal Year, the total amount of Eligible Expenditures Incurred by Ultimate Recipients on Projects in the previous Fiscal Year.
    2. For Projects funded under the public transit stream, the green infrastructure stream, the community, culture and recreation infrastructure stream, and rural and northern communities infrastructure stream, British Columbia will submit a claim to Canada covering Eligible Expenditures on a semi-annual basis at a minimum, to both Parties' satisfaction. Each claim will include an attestation in a format acceptable to both Parties, from a delegated official, that Eligible Expenditures have been Incurred in accordance with this Agreement and British Columbia is in compliance with progress reporting requirements as described in section 14 (Reporting).
    3. For Projects funded under the COVID-19 resilience infrastructure stream, British Columbia will submit a claim to Canada covering Eligible Expenditures on a quarterly basis as part of the Project progress report, as set out in section 14 (Progress Reporting), to the satisfaction of both Parties.
    4. For Projects funded under the public transit stream, the green infrastructure stream, the community, culture and recreation infrastructure stream, and the rural and northern communities infrastructure stream, British Columbia will submit a final claim to Canada covering Eligible Expenditures no later than December 31st, 2027 to both Parties' satisfaction.
    5. For all Projects funded under the COVID-19 resilience infrastructure stream, British Columbia will submit a final claim to Canada covering Eligible Expenditures no later than July 31st 2022, or July 31st 2023 for Projects in Remote Communities.
    6. For Projects funded under the public transit stream, the green infrastructure stream, the community, culture and recreation infrastructure stream, and rural and northern communities infrastructure stream, Canada will make a payment to British Columbia promptly upon review and acceptance of a claim, subject to the terms and conditions of this Agreement.
    7. For Projects funded under the COVID-19 resilience infrastructure stream, Canada will make a payment to British Columbia promptly upon review and acceptance of the project progress report, as set out in section 14 (Progress Reporting), subject to the terms and conditions of this Agreement.

1.25 Paragraphs b) and c) of section 15.2 (Payment Conditions) are deleted and replaced by:

  1. pay capital costs for a Project until the requirements under section 11 (Environmental Assessment) and section 12 (Aboriginal Consultation), if applicable, are, in Canada's opinion, satisfied to the extent possible at the date the claim is submitted to Canada;
  2. pay any claims until requirements under section 8 (British Columbia Investing in Canada Infrastructure Program Infrastructure Plan) and section 14 (Reporting) are received and accepted by Canada, and any audit requirements in section 18 (Audit) and any requirements outlined in Schedule B (Communications Protocol) are met; and

1.26 Paragraph d), as set out below, is added to section 15.2 (Payment Conditions)

  1. pay any claims related to land acquisition costs until British Columbia provides any information required by Canada to assess the eligibility of those costs, to both Parties' satisfaction.

1.27 Paragraph b) of Section 15.3 (Payment Deadline) is deleted and replaced by:

  1. For all Projects funded under the public transit stream, the green infrastructure stream, the community, culture and recreation infrastructure stream, and the rural and northern communities infrastructure stream, Canada will make the final payment no later than March 31st, 2028. For all Projects funded under the COVID-19 resilience infrastructure stream, Canada will make the final payment no later than October 31st 2022, or October 31st 2023 for Projects in Remote Communities.

1.28 Paragraph a) of Section 16 (Administrative Expenses) is deleted and replaced by:

  1. British Columbia may apply part of its allocation under only sections A.1 a) i. through iv. of Schedule A (Program Detail) to Administrative Expenses as outlined in section A.2 c) (Eligible Expenditures) of Schedule A.

1.29 Paragraph c), as set out below, is deleted from Section 16 (Administrative Expenses):

  1. British Columbia will apply an equal percentage of contribution funding, as approved by Canada, from each stream as identified in paragraphs a) through d) of section 3 (Commitments by Canada) to total Administrative Expenses.

1.30 Paragraph b) of section 24.1 (Disposal of Assets) is deleted and replaced by:

  1. For any Asset other than land purchased or acquired with contribution funding provided by Canada under this Agreement, if at any time within the Asset Disposal Period, an Ultimate Recipient sells, leases, or otherwise disposes of, directly or indirectly, any Asset purchased, acquired, constructed, rehabilitated or renovated, in whole or in part, under this Agreement, other than to Canada, British Columbia, a local or Regional Government as outlined in paragraph ii. a) of section A.2 a) (Ultimate Recipients) of Schedule A, or with Canada's consent, British Columbia may be required to reimburse Canada, any federal funding received for the Project.

1.31 Paragraph c), as set out below, is added to section 24.1 (Disposal of Assets):

  1. For any Asset that is land purchased or acquired with contribution funding provided by Canada under this Agreement, if at any time within the Asset Disposal Period, an Ultimate Recipient proposes to sell, lease, or otherwise dispose of, directly or indirectly, that land, British Columbia will:
    1. prior to such disposition of that land, obtain Canada's written consent to such disposition of that land;
    2. prior to such disposition of that land, obtain a written attestation from the Ultimate Recipient that the amount to be paid for the sale of that land is at or above Fair Market Value; and
    3. upon Canada's request, reimburse Canada an amount equal to the contribution funding paid by Canada under this Agreement that was used to purchase or acquire that land.

1.32 Section 24.2 (Revenue from Assets) is deleted and replaced by:

  • 24.2 Revenue from assets

    The Parties acknowledge that Canada's contribution to a Project is meant to accrue to the public benefit. British Columbia will notify Canada in writing within ninety (90) business days of the end of a Fiscal Year if any Asset owned by a for-profit Ultimate Recipient as defined in paragraph ii. d) of section A.2 a) (Ultimate Recipients) of Schedule A is used in such a way that, in the Fiscal Year, revenues are generated from it that exceed its operating expenses. Canada may require British Columbia to immediately pay to Canada a portion of the excess in the same proportion as the total cost of the Asset. This obligation will only apply during the Asset Disposal Period.

1.33 Schedule A (Program Details) is deleted and replaced by:

  • Schedule A – Program details

    A.1 Contribution Funding

    1. Contribution by Canada

      In accordance with section 3 (Commitments by Canada), Canada agrees to provide contribution funding to British Columbia for Projects under each of the Program streams as follows:

      1. under the public transit stream, up to two billion six hundred ninety-one million one hundred and one thousand eight hundred ninety-four dollars ($2,691,101,894), to be paid in accordance with Schedules A.2 (General Program Requirements) and A.3 (Public Transit)
      2. under the green infrastructure stream, up to eight hundred fifty-eight million, one hundred ninety-four thousand, seven hundred twenty-one dollars ($858,194,721), to be paid in accordance with Schedules A.2 (General Program Requirements) and A.4 (Green Infrastructure)
      3. under the community, culture and recreation infrastructure stream, up to one hundred fifty-seven million, eighty-one thousand, seven hundred nineteen dollars ($157,081,719), to be paid in accordance with Schedules A.2 (General Program Requirements) and A.5 (Community, Culture and Recreation Infrastructure)
      4. under the rural and northern communities infrastructure stream, up to one hundred and one million, seven hundred seventy-one thousand, eight hundred twenty-seven dollars ($101,771,827), to be paid in accordance with Schedules A.2 (General Program Requirements) and A.6 (Rural and Northern Communities Infrastructure)
      5. under the COVID-19 resilience infrastructure stream, up to one hundred and nine million, two hundred thirty thousand dollars ($109,230,000), to be paid in accordance with A.2 (General Program Requirements) and A.7 (COVID-19 Resilience Infrastructure)
    2. Fiscal Year Breakdown

      Canada's total contribution funding under each stream will be allocated in accordance with that stream's estimated maximum amount as set out in the All Streams Estimated Fiscal Year Breakdown Table, as updated through administrative processes:

      All Streams Estimated Fiscal Year Breakdown Table

      Public Transit – Canada ($M)

      Green Infrastructure – Canada ($M)

      Community, Culture and Recreation

      Infrastructure – Canada ($M)

      Rural and Northern Communities Infrastructure – Canada ($M)

      COVID-19 Resilience Infrastructure – Canada ($M)

      2018-2019

      $5,342,101.57

      $265,067.09

      $46,103.31

      $48,730.60

      2019-2020

      $27,237,261.50

      $34,748,579.38

      $55,551.46

      $58,717.16

      2020-2021

      $115,111,949

      $41,614,292

      $15,026,533

      $9,755,595

      $0

      2021-2022

      $371,105,338

      $95,133,026

      $41,537,316

      $31,806,016

      $76,000,000

      2022-2023

      $517,726,734

      $134,949,809

      $45,193,104

      $28,793,138

      $33,230,000

      2023-2024

      $473,065,264

      $164,858,677

      $29,334,805

      $16,671,868

      $0

      2024-2025

      $407,325,910

      $191,556,780

      $15,691,589

      $9,673,434

      2025-2026

      $315,882,063

      $123,095,323

      $10,046,108

      $4,805,187

      2026-2027

      $343,678,063

      $71,545,569

      $76,250

      $80,580

      2027-2028

      $114,627,210

      $427,599

      $74,359

      $78,561

      TOTAL

      $2,691,101,894

      $858,194,721

      $157,081,719

      $101,771,827

      $109,230,000

  • A.2 General Program Requirements

    1. Ultimate Recipients
      1. British Columbia may be an Ultimate Recipient and may distribute Canada's contribution funding to its own Projects, subject to the terms and conditions of this Agreement.
      2. British Columbia may further distribute Canada's contribution funding to the following Ultimate Recipients for Projects, subject to the terms and conditions of this Agreement:
        1. A local or Regional Government established by or under provincial statute;
        2. A public sector body that is established by or under provincial statute or by regulation or is wholly-owned by British Columbia, or a local or Regional Government;
        3. When working in collaboration with a local government, a public or not-for-profit institution that is directly or indirectly authorized, under the terms of provincial or federal statute, or royal charter, to deliver post-secondary courses or programs that lead to recognized and transferable post-secondary credentials;
        4. A private sector body, including for-profit organizations and not-for-profit organizations. In the case of for-profit organizations, they will need to work in collaboration with one or more of the entities referred to above or an Indigenous Ultimate Recipient listed below; and
        5. The following Indigenous Ultimate Recipients:
          1. An Indigenous Governing Body, including but not limited to:
            1. A band council within the meaning of section 2 of the Indian Act;
            2. A First Nation, Inuit or Métis government or authority established pursuant to a self-government agreement or a comprehensive land claim agreement between Her Majesty the Queen in Right of Canada and an Indigenous people of Canada, that has been approved, given effect and declared valid by federal legislation; and
            3. A First Nation, Inuit or Métis government that is established by or under legislation whether federal or provincial that incorporates a governance structure; and
          2. An Indigenous development corporation; and
          3. A not-for-profit organization whose central mandate is to improve Indigenous outcomes.
    2. Eligible Projects
      1. Eligible Projects will support public infrastructure, defined as tangible capital assets primarily for public use and/or benefit, in accordance with sections A.3 c), A.4 c), A.5 b), A.6 b) and A.7 b) of this Schedule.
      2. Planning projects can be considered eligible Projects if they support the eventual construction of an infrastructure project that aligns with at least one of the outcomes listed in the outcomes tables in sections A.3 c), A.4 c), A.5 b), and A.6 b) of this Schedule.
    3. Eligible Expenditures

      Eligible Expenditures will include the following:

      1. All costs considered by Canada to be direct and necessary for the successful implementation of an eligible Project, excluding those explicitly identified in section A.2 e) (Ineligible Expenditures), and which may include capital costs, design and planning, and costs related to meeting specific Program requirements, including completing climate lens assessments as outlined in paragraph g) of section 4 (Commitments by British Columbia) and creating community employment benefit plans as outlined in paragraph h) of section 4 (Commitments by British Columbia);
      2. British Columbia's Administrative Expenses as approved by Canada under section 16 (Administrative Expenses);
      3. The incremental costs of employees of an Ultimate Recipient may be included as Eligible Expenditures for a Project under the following conditions:
        1. The Ultimate Recipient is able to demonstrate that it is not economically feasible to tender a Contract; and
        2. The arrangement is approved in advance and in writing by Canada.
      4. Costs will only be eligible as of Project approval, except for the following costs which are eligible if Incurred before a Project is approved by Canada for contribution funding under this Agreement, but can only be paid if and when that Project is approved by Canada:
        1. Costs associated with completing climate lens assessments as outlined in paragraph g) of section 4 (Commitments by British Columbia); and
        2. Costs associated with Aboriginal consultation and engagement activities, which are retroactively eligible from February 15, 2018 for Projects approved after February 7, 2019.
      5. Land acquisition, if approved by Canada, directly related to the development of Natural Infrastructure for a Project that aligns with an adaptation, resilience and disaster mitigation outcome in the Green Infrastructure Outcomes table, as set out in section A.4 c) (Eligible Project Outcomes).
    4. Ineligible Projects

      Investments in health and education facilities are not eligible for contribution funding under this Agreement, except as otherwise specified in section c) (Ineligible Projects) of Schedule A.5 (Community, Culture and Recreation Infrastructure), sections b) (Eligible Project Outcomes) and c) (Ineligible Projects) of Schedule A.6 (Rural and Northern Communities Infrastructure), and section b) (Eligible Projects) of Schedule A.7 (COVID-19 Resilience Infrastructure).

    5. Ineligible Expenditures

      Ineligible expenditures for Projects will include the following:

      1. Costs Incurred before a Project is approved by Canada and any and all expenditures related to contracts signed prior to Canada's approval of a Project, except for:
        1. Costs associated with completing climate lens assessments as outlined in paragraph g) of section 4 (Commitments by British Columbia); and
        2. Costs associated with Aboriginal consultation and engagement activities, which are retroactively eligible from February 15, 2018 for Projects approved after February 7, 2019.
      2. Costs Incurred for cancelled Projects;
      3. Costs of relocating entire communities;
      4. Land acquisition, except in accordance with paragraph v) of section A.2 c) (Eligible Expenditures);
      5. Leasing land, buildings and other facilities; leasing equipment other than equipment directly related to the construction of the Project; real estate fees and related costs;
      6. Any overhead costs, including salaries and other employment benefits of any employees of the Ultimate Recipient, any direct or indirect operating or administrative costs of Ultimate Recipients, and more specifically any costs related to planning, engineering, architecture, supervision, management and other activities normally carried out by the Ultimate Recipient's staff, except in accordance with paragraph iii. of section A.2 c) (Eligible Expenditures);
      7. Financing charges, legal fees, and loan interest payments, including those related to easements (e.g. surveys);
      8. Any goods and services costs which are received through donations or in kind;
      9. Provincial sales tax, goods and services tax, or harmonized sales tax for which the Ultimate Recipient is eligible for a rebate, and any other costs eligible for rebates;
      10. Costs associated with operating expenses and regularly scheduled maintenance work, with the exception of essential capital equipment purchased at the onset of the construction/acquisition of the main Asset and approved by Canada;
      11. Cost related to furnishing and non-fixed assets which are not essential for the operation of the Asset/Project, with the exception of temporary infrastructure funded under the COVID-19 resilience infrastructure stream, as approved by Canada;
      12. All capital costs, including site preparation and construction costs, until Canada has confirmed that environmental assessment and Aboriginal consultation obligations as required under sections 11 (Environmental Assessment) and 12 (Aboriginal Consultation) have been met and continue to be met;
      13. Land acquisition in cases where it is the sole Project component; and
      14. Costs associated with or for the acquisition of publicly-owned land.

A.3 Public Transit

  1. Objective

    The public transit stream will support new transit networks, service extensions and active transportation infrastructure that will transform the way that Canadians live, move and work.

  2. Canada's Contribution
    1. Allocation to Ultimate Recipients
      1. Unless otherwise agreed to by Canada, British Columbia agrees to allocate Canada's public transit stream contribution funding to each transit system based solely on ridership as set out in the Public Transit Sub-Allocation Table:
        Public Transit Sub-Allocation Table

        Transit System

        Ridership

        BC Transit

        50,422,115

        Translink

        239,061,135

      2. Subject to approval by Canada, and British Columbia confirming to Canada the agreement of the affected transit systems, the Parties may re-allocate Canada's public transit stream contribution funding to Ultimate Recipients other than British Columbia, BC Transit or Translink, for eligible projects.. British Columbia will ensure that any applicable Ultimate Recipient Agreements are amended to reflect these funding allocation changes.
      3. British Columbia agrees that a maximum of four hundred and three million, six hundred sixty-five thousand, two hundred and eighty-four dollars ($403,665,284) of Canada's public transit allocation amount under sections A.1 a) i. of this Schedule paragraph may be paid to public transit rehabilitation Projects, unless otherwise approved by Canada.
      4. Subject to approval by Canada, and British Columbia confirming to Canada the agreement of the affected transit systems, British Columbia may combine the allocations of transit systems based on the Public Transit Sub-Allocation Table, as amended, to facilitate the integration of these public transit systems.
  3. Eligible Project Outcomes

    Projects eligible for public transit stream contribution funding under this Agreement must align with at least one of the outcomes in the Public Transit Outcomes Table, except for planning projects, as described in paragraph ii) of section A.2 b) (Eligible Projects), where the eventual infrastructure project must align with at least one of the outcomes in the Public Transit Outcomes Table.

    Public Transit Outcomes Table

    Improved capacity of public transit infrastructure

    Improved quality and/or safety of existing and/or future public transit

    Improved access to public transit

    Improved capacity and/or quality of pathways and/or active transportation infrastructure

  4. Ineligible Projects

    When a project aligns with an outcome in the Public Transit Outcomes Table, it is not eligible for contribution funding under this Agreement if it:

    1. Involves private sector for-profit transportation services, including inter-community bus, rail, port, or ferry infrastructure;
    2. Involves inter-community bus, rail, port and ferry infrastructure that is not part of a public transit system, unless Construction Start for the project can occur by September 30th, 2021; or
    3. Is a stand-alone pathway or active transportation project, unless Construction Start for the project can occur by September 30th, 2021.
  5. Stacking and Cost-Sharing
    1. The maximum funding from all federal sources to a Project that is approved for public transit stream contribution funding under this Agreement will be up to:
      1. Forty percent (40%) of Eligible Expenditures in British Columbia for new construction and expansion of public transit and active transportation;
      2. Fifty percent (50%) of Eligible Expenditures in British Columbia for public transit rehabilitation Projects; or
      3. Twenty-five percent (25%) of Eligible Expenditures for any for-profit private sector Ultimate Recipients notwithstanding a) or b) in this section.
    2. If the federal Crown's total funding towards a Project under the public transit stream exceeds the federal funding limits set out in paragraph i) of this section or if the Total Financial Assistance received or due in respect of the total Project costs exceeds one hundred percent (100%) thereof, Canada may recover the excess from British Columbia or reduce its contribution by an amount equal to the excess.
    3. Canada's contribution to all Projects under the public transit stream will not exceed the amount as set out in section A.1 a) i. of this Schedule.
  6. Federal Requirements

    Each Project that aligns with an outcome in the Public Transit Outcomes Table must meet the following stream-specific requirement, as applicable:

    1. Public transit refers to modes of public transportation that allow for the movement of passengers within and/or outside an urban (metropolitan) or municipal setting. As such, projects involving pathways and active transportation, as well as inter-community bus, rail, port and ferry infrastructure that are owned by a public sector body or created under provincial statute are eligible in the context of commuter transit.
    2. Construction Start must occur by September 30th, 2021 for any Project that is a stand-alone pathway or active transportation Project, or an inter-community bus, rail, port and ferry infrastructure Project that is not part of a public transit system.

A.4 Green Infrastructure

  1. Objective

    The green infrastructure stream will support greenhouse gas emission (GHG) reductions, enable greater adaptation and resilience to the impacts of climate change, climate-related disaster mitigation, and ensure that more communities can provide clean air and safe drinking water for their citizens. This stream includes the following three sub-streams:

    1. climate change mitigation;
    2. adaptation, resilience, disaster mitigation; and
    3. environmental quality.
  2. Canada's Contribution
    1. Allocation to Sub-Streams
      1. British Columbia agrees to allocate a minimum of four hundred six million, four hundred thirty-seven thousand, six hundred twenty-four dollars ($406,437,624) of Canada's allocation amount under section A.1 a) ii. of this Schedule to Projects under the climate change mitigation sub-stream, subject to the provisions of section 16 (Administrative Expenses).
  3. Eligible Project Outcomes

    Projects eligible for green infrastructure stream contribution funding under this Agreement must align with at least one of the outcomes in the Green Infrastructure Outcomes Table, except for planning projects, as described in paragraph ii) of section A.2 b) (Eligible Projects), where the eventual infrastructure project must align with at least one of the outcomes in the Green Outcomes Table.

    Green Infrastructure Outcomes Table

    Climate Change Mitigation Outcomes:

    Increased capacity to manage renewable energy

    Increased access to clean energy transportation

    Increased energy efficiency of buildings

    Increased capacity to generate clean energy

    Adaptation, Resilience and Disaster Mitigation Outcomes:

    Increased structural capacity and/or increased natural capacity to adapt to climate change impacts, natural disasters and/or extreme weather events

    Environmental Quality Outcomes:

    Increased capacity to treat and/or manage wastewater and/or stormwater

    Increased access to potable water

    Increased capacity to reduce and/or remediate soil and/or air pollutants

    Improved capacity and/or quality of pathways and/or active transportation infrastructure

  4. Ineligible Projects
    1. When a project aligns with a climate change mitigation outcome in the Green Infrastructure Outcomes Table, it is not eligible for contribution funding under this Agreement if it:
      1. involves private sector for profit transportation services, including inter-community bus, rail, port and ferry infrastructure;
      2. involves inter-community bus, rail, port and ferry infrastructure that is not part of a public transit system, unless Construction Start for the project can occur by September 30th, 2021;
      3. is an energy retrofit project, unless the energy retrofit project is on an asset that would be considered eligible for funding under the public transit stream, the green infrastructure stream, the community, culture and recreation infrastructure stream, the rural and northern communities infrastructure stream or the National Housing Strategy;
      4. involves emergency services infrastructure.
    2. When a project aligns with an adaptation, resilience and disaster mitigation outcome in the Green Infrastructure Outcomes Table, it is not eligible for contribution funding under this Agreement if it:
      1. relocates whole communities;
      2. involves emergency services infrastructure; or
      3. addresses seismic risks.
    3. When a project aligns with an environmental quality outcome in the Green Infrastructure Outcomes Table, it is not eligible for contribution funding under this Agreement if it is a pathway or active transportation project, unless Construction Start for the project can occur by September 30th, 2021.
  5. Stacking and Cost-Sharing
    1. The maximum funding from all federal sources to a Project that is approved for green infrastructure stream contribution funding under this Agreement will be up to:
      1. Fifty percent (50%) of Eligible Expenditures for British Columbia;
      2. Forty percent (40%) of Eligible Expenditures for local governments, Regional Governments, and not-for-profit organizations;
      3. Seventy-five percent (75%) of Eligible Expenditures for Indigenous Ultimate Recipients; or
      4. Twenty-five percent (25%) of Eligible Expenditures for any for-profit, private sector Ultimate Recipients, notwithstanding paragraphs a), b) or c) in this section.
    2. The maximum funding to a Project under the green infrastructure stream from all federal sources will not exceed the limits set out in paragraph i) of this section, except for Indigenous Ultimate Recipients, which may access additional funding for a Project up to a maximum of one hundred percent (100%) of Eligible Expenditures from all federal sources subject to approval by Canada.
    3. If the federal Crown's total funding towards a Project under the green infrastructure stream exceeds the federal funding limits set out in paragraphs i) and ii) of this section, or if the Total Financial Assistance received or due in respect of the total Project costs exceeds one hundred percent (100%) thereof, Canada may recover the excess from British Columbia or reduce its contribution by an amount equal to the excess.
    4. Canada's contribution to all Projects under the green infrastructure stream will not exceed the amount as set out in section A.1 a) ii. of this Schedule.
  6. Federal Requirements
    1. Each Project that aligns with a climate change mitigation outcome in the Green Infrastructure Outcomes Table must meet the following requirement, as applicable:
      1. Public transit refers to modes of public transportation that allow for the movement of passengers within and/or outside an urban (metropolitan) or municipal setting. As such, projects involving first-mile – last-mile active transportation connections to a transit system, as well as inter-community bus, rail, port and ferry infrastructure that are owned by a public sector body or created under provincial statute are eligible in the context of commuter transit.
      2. Construction Start must occur by September 30th, 2021 for any Project that is an inter-community bus, rail, port and ferry infrastructure Project that is not part of a public transit system.
    2. Each Project that aligns with an environmental quality outcome in the Green Infrastructure Outcomes Table must meet the following requirements, as applicable:
      1. Wastewater Projects must result in wastewater effluent that meets the Wastewater Systems Effluent Regulations or provincial regulations where there is a federal equivalency agreement in place, where applicable.
      2. Drinking water quality following completion of a drinking water Project must meet or exceed provincial standards.
      3. Solid waste diversion Projects must result in a measurable increase in the quantity of material diverted from disposal as measured against a baseline using the Generally Accepted Principles for Calculating Municipal Solid Waste System Flow.
      4. Projects that reduce or remediate soil pollutants must be undertaken on properties that are contaminated, as confirmed by a Phase II Environmental Site Assessment.
      5. Construction Start must occur by September 30th, 2021 for any Project that is a pathway or active transportation Project.

A.5 Community, Culture and Recreation Infrastructure

  1. Objective

    The community, culture and recreation infrastructure stream will build stronger communities and improve social inclusion.

  2. Eligible Project Outcomes

    Projects eligible for community, culture and recreation infrastructure stream contribution funding under this Agreement must align with the outcome in the Community, Culture and Recreation Infrastructure Outcomes Table, except for planning projects, as described in paragraph ii) of section A.2 b) (Eligible Projects), where the eventual infrastructure project must align with at least one of the outcomes in the Community, Culture and Recreation Infrastructure Outcomes Table.

    Community, Culture and Recreation Infrastructure Outcomes Table

    Improved access to and/or increased quality of community, cultural, and/or recreational infrastructure

  3. Ineligible Projects
    1. When a project aligns with an outcome in the Community, Culture and Recreation Infrastructure Outcomes Table, it is not eligible for contribution funding under this Agreement if it:
      1. has a private sector, for-profit Ultimate Recipient;
      2. is a stand-alone daycare facility, for-profit daycare facility, daycare facility associated with a school board, or a daycare facility funded under Canada's Early Learning and Child Care initiative;
      3. is a religious site that serves as a place of assembly for religious purposes, which includes among others, a site, church, mosque, synagogue, temple, chapel (e.g., within a convent or seminary), shrine or meeting house; or
      4. is a sports facility that serves as a home facility for a professional or semi-professional sport team, such as those that serve major junior hockey leagues.
    2. Within Community Infrastructure Projects that align with an outcome in the Community, Culture and Recreation Infrastructure Outcomes Table, elements of the Project that include dedicated spaces for healthcare, education or tourism purposes; provincial or municipal services; or for-profit uses are ineligible for contribution funding under this Agreement, except for dedicated healthcare or education spaces that benefit Indigenous people by advancing the Truth and Reconciliation Commission's Calls to Action, as approved by Canada.
  4. Stacking and Cost-Sharing
    1. The maximum funding from all federal sources to a Project approved for community, culture and recreation infrastructure stream contribution funding under this Agreement will be up to:
      1. Fifty percent (50%) of Eligible Expenditures for British Columbia,
      2. Forty percent (40%) of Eligible Expenditures for local governments, Regional Governments and not-for-profit organizations, or
      3. Seventy-five percent (75%) of Eligible Expenditures for Indigenous Ultimate Recipients notwithstanding a) and b) in this section.
    2. The maximum funding to a Project under the community, culture and recreation infrastructure stream from all federal sources will not exceed the limits set out in paragraph i) of this section, except for Indigenous Ultimate Recipients, which may access additional funding for a Project up to a maximum of one hundred percent (100%) of Eligible Expenditures from all federal sources subject to approval by Canada.
    3. If the federal Crown's total funding towards a Project under the community, culture and recreation infrastructure stream exceeds the federal funding limits set out in paragraphs i) and ii) of this section, or if the Total Financial Assistance received or due in respect of the total Project costs exceeds one hundred percent (100%) thereof, Canada may recover the excess from British Columbia or reduce its contribution by an amount equal to the excess.
    4. Canada's contribution to all Projects under the community, culture and recreation infrastructure stream will not exceed the amount as set out section A.1 a) iii. of this Schedule.
  5. Federal Requirements

    Each Project that aligns with an outcome in the Community, Culture and Recreation Infrastructure Outcomes Table must meet the following requirements, as applicable:

    1. Community, culture and recreation Projects must be community-oriented, non-commercial in nature and open for use to the public and not limited to a private membership.
    2. British Columbia will prioritize assets that serve vulnerable populations.
    3. “Community Infrastructure” is defined as community hubs and community centres. These are publicly accessible, multi-purpose spaces that bring together a variety of different services, programs and/or social and cultural activities to reflect local community needs.
    4. Health and education facilities must benefit Indigenous people by advancing the Truth and Reconciliation Commission's Calls to Action, as approved by Canada.

A.6 Rural and Northern Communities Infrastructure

  1. Objective

    The rural and northern communities infrastructure stream will support Projects that improve the quality of life in rural and northern communities by responding to rural- and northern-specific needs.

  2. Eligible Project Outcomes
    1. Projects eligible for rural and northern communities infrastructure stream contribution funding under this Agreement:
      1. must align with at least one of the outcomes in the Rural and Northern Communities Infrastructure Outcomes Table, except for planning projects, as described in paragraph ii) of section A.2 b) (Eligible Projects), where the eventual infrastructure project must align with at least one of the outcomes in the Rural and Northern Communities Infrastructure Outcomes Table; or
        Rural and Northern Communities Infrastructure Outcomes Table

        Improved food security

        Improved and/or more reliable road, air and/or marine infrastructure

        Improved access to broadband connectivity, including Internet and mobile wireless infrastructure

        More efficient and/or reliable energy

        Improved education and/or health facilities (specific to the Truth and Reconciliation Commission's Calls to Action)

      2. must, subject to approval by Canada, align with at least one of the project outcomes in the Public Transit Outcomes Table, the Green Infrastructure Outcomes Table or the Community, Culture and Recreation Infrastructure Outcomes Table.
  3. Ineligible Projects

    When a project aligns with an outcome in the Rural and Northern Communities Infrastructure Outcomes Table, it is not eligible for contribution funding under this Agreement if it:

    1. is privately-owned housing;
    2. is an early learning and childcare facility;
    3. is a health facility, or an education facility, except to benefit Indigenous peoples by advancing the Truth and Reconciliation Commission's Calls to Action as approved by Canada;
    4. is a highway or trade corridor infrastructure, except for portions that connect communities that do not already have year round road access; or
    5. is resource development infrastructure, notably industrial resource development access roads;
    6. is a mobile wireless project, unless Construction Start for the project can occur by September 30th, 2021.
  4. Stacking and Cost-Sharing
    1. The maximum funding from all federal sources to a Project that is approved for rural and northern communities infrastructure stream contribution funding under this Agreement will be up to:
      1. Fifty percent (50%) of Eligible Expenditures for British Columbia, local governments and Regional Governments with a population of five thousand (5,000) or more and not-for-profit Ultimate Recipients;
      2. Sixty percent (60%) of Eligible Expenditures for local governments and Regional Governments with a population of less than five thousand (5,000);
      3. Seventy-five percent (75%) of Eligible Expenditures for Indigenous Ultimate Recipients; or
      4. Twenty-five percent (25%) of Eligible Expenditures for for-profit, private sector Ultimate Recipients, except for for-profit private sector Ultimate Recipients carrying out a project under the “Improved access to broadband connectivity, including Internet and mobile wireless infrastructure” outcome in the Rural and Northern Communities Infrastructure Outcomes Table, for which the maximum funding from all federal sources will be up to:
        1. Fifty percent (50%) of Eligible Expenditures for that project carried out in British Columbia; or
        2. Seventy-five percent (75%) of Eligible Expenditures for that project carried out in communities that are governed by one of the entities listed in paragraph ii) e) of section A.2 a) (Ultimate Recipients).
    2. The maximum funding to a Project under the rural and northern communities infrastructure stream from all federal sources will not exceed the limits set out in paragraph i) of this section, except for Indigenous Ultimate Recipients, which may access additional funding for a Project up to a maximum of one hundred percent (100%) of Eligible Expenditures from all federal sources subject to approval by Canada.
    3. If the federal Crown's total funding towards a Project under the rural and northern communities infrastructure stream exceeds the federal funding limits set out in paragraphs i) and ii) of this section, or if the Total Financial Assistance received or due in respect of the total Project costs exceeds one hundred percent (100%) thereof, Canada may recover the excess from British Columbia or reduce its contribution by an amount equal to the excess.
    4. Canada's contribution to all Projects under the rural and northern communities infrastructure stream will not exceed the amount as set out in section A.1 a) iv. of this Schedule.
  5. Federal Requirements
    1. Each Project that aligns with an outcome in the Rural and Northern Communities Infrastructure Outcomes Table must meet the following requirements:
      1. Projects will be restricted to those situated within, and that are for the direct benefit of, rural and northern communities with a population of twenty-five thousand (25,000) or less based on 2016 Statistics Canada Census data.
      2. British Columbia will respect the unique and wide-ranging infrastructure needs of rural and northern communities, including by considering projects that would advance reconciliation with Indigenous Peoples as per the Truth and Reconciliation Commission's Calls to Action and the United Nations' Declaration on the Rights of Indigenous Peoples, as well as capacity building needs of rural and northern communities.
      3. Construction Start must occur by September 30th, 2021 for any Project that is a mobile wireless Project.

A.7 COVID-19 Resilience Infrastructure

  1. Objective

    The COVID-19 resilience infrastructure stream will provide funding to support COVID-19 response and economic recovery efforts.

  2. Eligible Projects

    Projects eligible for COVID-19 resilience infrastructure stream contribution funding under this Agreement must comply with a project category and sub-category in the COVID-19 Resilience Infrastructure Project Categories and Sub-Categories Table, as determined by Canada

    COVID-19 Resilience Infrastructure Project Categories and Sub-Categories Table

    Project Categories

    Project Sub-Categories

    Retrofits, repairs and upgrades

    • Local and Regional Governments and provincial/territorial/Indigenous buildings
    • Health infrastructure
    • Educational Infrastructure

    COVID-19 Resilience Infrastructure

    • Any public infrastructure asset* where the purpose of the project is to build, modify and/or reconfigure the asset to respond to the COVID-19 pandemic. This includes temporary infrastructure.

    Active transportation infrastructure

    • Active transportation infrastructure, including parks, trails, foot bridges, bike lanes and multi-use paths

    Disaster mitigation and, adaptation infrastructure

    • Any public infrastructure asset, including Natural Infrastructure, where the purpose of the project is to build, modify and, or reinforce to prevent, mitigate or protect against the impacts of climate change, disasters triggered by natural hazards, and extreme weather events.
    • Any public infrastructure asset*, including Natural Infrastructure, where the purpose of the project is to build, modify and, or reinforce to prevent, mitigate or protect against floods and fires.
    • Assets associated with afforestation and reforestation

    *For the purpose of this project category, public infrastructure asset includes not-for-profit and for-profit infrastructure projects where the project is for public use and/or benefit.

  3. Ineligible Projects

    When a project complies with a project category and sub-category in the COVID-19 Resilience Infrastructure Project Categories and Sub-Categories Table, it is not eligible for contribution funding under this Agreement if it:

    1. is tourism infrastructure;
    2. is a facility that serves as a home to a professional sports team; or
    3. is a planning project.
  4. Stacking and Cost-Sharing
    1. The maximum funding from all federal sources to a Project approved for COVID-19 resilience infrastructure stream contribution funding under this Agreement will be up to:
      1. Eighty percent (80%) of Eligible Expenditures for local governments, Regional Governments, not-for profit organizations, and British Columbia,
      2. One hundred percent (100%) of Eligible Expenditures for Indigenous Ultimate Recipients, or
      3. Twenty-five percent (25%) of Eligible Expenditure for any for-profit, private sector Ultimate Recipients
    2. The maximum funding to a Project under the COVID-19 resilience infrastructure stream from all federal sources will not exceed the limits set out in paragraph i) of this section.
    3. If the federal Crown's total funding towards a Project under the COVID-19 resilience infrastructure stream exceeds the federal funding limits set out in paragraphs i) of this section, or if the Total Financial Assistance received or due in respect of the total Project costs exceeds one hundred percent (100%) thereof, Canada may recover the excess from British Columbia or reduce its contribution by an amount equal to the excess.
    4. Canada's contribution to all Projects under the COVID-19 resilience infrastructure stream will not exceed the amount as set out in section A.1 a) v. of this Schedule.
  5. Federal Requirements

    Each Project that complies with a project category and sub-category in the COVID-19 Resilience Infrastructure Project Categories and Sub-Categories Table must meet the following requirements:

    1. A COVID-19 resilience infrastructure stream Project must not exceed ten million dollars ($10,000,000) in total estimated Eligible Expenditures.
    2. To be considered for contribution funding, a COVID-19 resilience infrastructure stream project must be submitted to Canada for review and approval by March 31, 2021, unless otherwise agreed to by Canada.
    3. Construction Start for a COVID-19 resilience infrastructure stream Project must occur by September 30th, 2021.
    4. A COVID-19 resilience infrastructure stream Project must be Substantially Completed by December 31st 2021, or by December 31st, 2022 if the Project is in a Remote Community.

2. Effect of amendments

  • 2.1 All capitalized terms not otherwise defined herein have the meaning ascribed to them in the Agreement.
  • 2.2 Except for the amendments provided for in this Amending Agreement No. 1, the obligations, covenants, and terms and conditions set forth in the Agreement will continue to remain in full force and effect.
  • 2.3 This Amending Agreement No. 1 may be signed in counterpart, and the signed copies will, when attached, constitute the original Amending Agreement No. 1 and will form part of the Agreement.
  • 2.4 This Amending Agreement No. 1 shall be effective as of the date this agreement is signed by the last Party.

3. Signatures

This Amending Agreement No. 1 has been executed on behalf of Canada by the Minister of Infrastructure and Communities and on behalf of Her Majesty the Queen in right of the Province of British Columbia by the Minister of Transportation and Infrastructure and the Minister of Municipal Affairs & Housing.

HER MAJESTY THE QUEEN IN RIGHT OF CANADA

HER MAJESTY THE QUEEN IN

RIGHT OF THE PROVINCE OF BRITISH COLUMBIA

The Honourable Catherine McKenna,
Minister of Infrastructure and Communities

The Honourable Claire Trevena,
Minister of Transportation and Infrastructure

Date

Date

HER MAJESTY THE QUEEN IN

RIGHT OF THE PROVINCE OF BRITISH COLUMBIA

The Honourable Selina Robinson,

Minister of Municipal Affairs & Housing